We encourage immediate priming to prevent
oxidation. Not responsible for flash rusting after blasting if not
picked up or Primed the same day.
Walk-in work lead times are
typically 2-4 weeks depending on Industrial Work load at the time.
*
CANDY APPLE TRANSPARENTS & CLEARS ADD
40% TO THE ABOVE PRICING.
ALL PARTS MUST BE DISASSEMBLED AND
FREE OF HEAVY OILS, PRIOR TO OUR RECEIPT. ADDITIONAL CHARGE FOR
SANDBLASTING WILL APPLY. SANDBLASTING CHARGE IS INCLUDED FOR ALL EXHAUST
SYSTEM CERAMIC COATINGS. W. KENDALL WILL NOT BE HELD RESPONSIBLE
FOR ANY OUT GASSING ON CAST PARTS. MINIMUM CHARGE OF $50.00 PER
COLOR CHANGE.
THINGS TO KEEP IN MIND ABOUT POWDER
AND CERAMIC COATINGS
BOTH THESE COATINGS ARE OVEN BAKED, AND MUST BE ABLE TO HANDLE A MINIMUM
OF 385 DEGREES. ALL SEAL, RUBBER ECT. MUST BE REMOVED PRIOR TO OUR
RECEIPT ALTHOUGH THESE COATINGS ARE TOUGH, THEY CAN BE SCRATCHED OR
CHIPPED IF NOT HANDLED CAREFULLY. WHEN INSTALLING TO AVOID DAMAGE,
ALWAYS USE FLAT WASHERS DURING REASSEMBLY.
|